A brief article about Project Management in construction
Project management in construction
Project management is a separately developed area of management with its own methodology, software, professional knowledge, methods and tools. Innovative experience shows that the implementation of project management allows you to reduce production costs by up to 15%.
A construction project is a temporary enterprise associated with the creation of a unique product or service, in accordance with the original terms of reference and allocated resources.
What is the main difference between construction projects and others?
First of all, the construction is based on a specific mission. The organization of such a project ends with the end of its assembly or implementation.
Working in construction involves having a broader outlook. At least because in it you will encounter many limitations that need to be taken into account when designing and implementing construction projects.
A product in a construction project is a finished object.
Construction objects include any structures or buildings under construction with all related utilities, equipment, auxiliary structures and devices that are provided for in the project plan.
• Building — a structure with an underground part (foundation), an aboveground part (the building itself) and utility networks (ventilation, water supply, sewerage).
• A structure is a linear system that includes several structures with underground and aboveground elements.
What is their fundamental difference?
• Buildings are designed for living or other social activities of people.
• Structures are used to move people or goods, store products or carry out production work (for example, dams, bridges, highways, etc.).
The peculiarity of project management is the transfer of rights, powers and responsibility for achieving project goals to one person – the project manager. Its task is to interact with the customer and designers, suppliers and landlords, company employees and other external contractors. The manager must have the following set of professional and personal competencies:
– knowledge of the processes, stages and tools of project management;
– knowledge of construction technology, design estimates and permits, pricing
in construction;
– knowledge of the basics of modern management;
– ability to conduct complex and problematic negotiations;
– leadership qualities, etc.
Project management in construction is
Optimization of the investment cycle:
• Reduction of the terms of PIR (design and survey work) and SMR (construction and installation work) due to detailed planning and timely attraction of resources;
• Cost reduction by eliminating inconsistencies and continuous monitoring of work technology;
• Optimization of the timing of MTO (logistics), organization of control over the preparation of production and manufacture of equipment.
Transparency and control:
• Unified methodology and information space;
• Integration of subsystems for managing contracts, supplies, and the estimate system in a single system
of calendar planning and monitoring of the project.
Responsibility:
• 3-key system – joint adoption of key decisions on the project by the main participants of the investment project;
• Project office - the center of responsibility for the implementation of the project (deadlines, budget and quality).
A product in a construction project must be finished to be considered a product. This is important regardless of the type and classification of construction.
Project management in construction begins long before the first brick on the construction site or the choice of a contractor.
As in other areas, any initiatives are initiated by a detailed and structured project plan containing all the necessary design and estimate documentation.
Money, time and quality are the three most important parameters of construction. In professional vocabulary, this trinity is called the "iron triangle". Problems on either side of this triangle will lead to a problem with the implementation of construction initiatives.
High-quality project management in construction guarantees:
• Successful completion of the work in full, on time and in accordance with the time constraints of construction.
• Targeted use of investments.
• High level of quality of all works.
• Clear compliance of the project with the allocated budget.
• Monitoring the implementation of all tasks in real time.
• Risk reduction.